Project: SpiritOfMudsuck   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Pete Dailey   -  
Project:   Sonex - Xenos-B Motorglider   -   VIEW REPORTS
Total Hours:1506.3
Total Flight Time:
Total Expense:$75148.03
Start/Last Date:Jul 01, 2016 - No Finish Date
Engine:Aerovee 2.1 Turbo
Propeller:Sensenich
Panel:MGL Avionics Explorer iEFIS/ECB/RDAC
 
Friendly URL: https://eaabuilderslog.org?s=SpiritOfMudsuck

Home or Last Project Picture

Feb 05, 2017     Dwg XNS-T06: Stabilator Parts Planning - (2.0 hours) Category: Research
Stabilator Construction Planning, Ribs
XNS-T06 Stabilator Substructure Details
-08 Root Rib Clip, from 1/8"x2"x2" angle
--09R, -09L R&L hand clips, from 1/8"x2"x2" angle
-12 Rib #2, from SNX-Z02-Z04 channel stock. Finished length=19-7/8" + 31/64" + 1/2" + trim allowance = 21" + 1" allowance = 22"
-13 Rib #3, from SNX-Z02-Z04 channel stock. Finished length=17-27/32" + 31/64" + 1/2" + trim allowance = 19" + 1" allowance = 20"
-14 Rib #4, from SNX-Z02-Z04 channel stock. Finished length=16" + 31/64" + 1/2" + trim allowance = 17" + 1" allowance = 18"
-15 Rib #5, from SNX-Z02-Z04 channel stock. Finished length=14-3/32" + 31/64" + 1/2" + trim allowance = 15-1/4" + 1" allowance = 16-1/4"
-16 Rib #6, from SNX-Z02-Z04 channel stock. Finished length=12-1/16" + 31/64" + 1/2" + trim allowance = 13-1/4" + 1" allowance = 14-1/4"
Stabilator channel required for a single set of ribs is 90.5".

Spar channel material SNX-Z03-02 absent from shipped kit parts!
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.